Decommissioning

What is Decommissioning?

Decommissioning is the final phase of a nuclear site’s lifecycle; it is the process of returning the site of a nuclear power plant to an agreed end-state for some form of re-use. This includes removing all fuel, taking down the plant and facilities and restoring the site. In some instances, the facility may not be completely dismantled, and the existing structures could be put to another use.

In terms of the responsibilities:

NRS (Nuclear Restoration Services) is responsible for the decommissioning of the UK’s legacy sites, along with Sellafield decommissioning the Sellafield site in addition to storage of waste.

Additionally, every nuclear site functions under a site license which is overseen by the Office for Nuclear Regulation (ONR). Within the license conditions, there is a requirement for the site owner to proactively plan for decommissioning at the end of the site’s life – this is Licence Condition 35 of 36. Additionally, the majority of activities involved in decommissioning are environmental restoration, so they are driven by environmental regulations.

The goal of decommissioning is to ensure long-term protection of the public and the environment, including reducing the levels of radionuclides in the facilities and materials onsite, so they can be safely recycled, reused, or disposed of safely.

The Process

Step 1

Post-operation, there is a transition phase where the site is prepared for decommissioning. There are around 300 fuel channels in each reactor, all of which need to be emptied carefully and removed from the facility. A fuelling machine removes the fuel assembly from a channel and each fuelling element is moved to a cooling pond for a minimum of 90 days.

Step 2

Once cooled, the fuel is packaged in a flask and is transported for further cooling until it can be safely disposed of.

Step 3

Following the transition phase, the site is decontaminated (contamination removed from surfaces) and then prepared for the removal of residual radioactive waste and other redundant facilities prior to final dismantling.

Step 4

The reactor building is left for a safe and passive period. Following this, the facility can be dismantled, and depending on planned end state, demolished.

Step 5

Remediation may also be required to manage areas of contaminated soil or groundwater to protect people and the environment during the next use of the site.

Case Studies

Hunterston B

Oldbury

Hinkley Point B